Eric Armishaw Toilet Blocks
Blasting, Waterproofing and Epoxy Flooring

Green by Nature

LOCATION

Point Chevalier, Auckland

SERVICE

Sand and soda blasting
01

The Challenge

The public toilet blocks faced constant tagging alongside ongoing exposure to moisture and frequent heavy cleaning. Layers of old paint had built up on the concrete block walls, concealing the condition of the substrate underneath and leaving it without proper protection. Before any lasting waterproofing or flooring work could go ahead, this build-up needed to be removed to reveal a sound surface suited to a public amenity.

02

Our Approach

BlastOff sandblasted the concrete block walls to strip away the accumulated paint and graffiti back to a clean substrate. With the surface prepared, a full waterproofing system was applied across the block walls and floor to protect against ongoing moisture in a wet-use public facility. The floor was then finished with a new epoxy coating chosen for its hygienic, hard-wearing and easy-to-clean qualities in a high-traffic public setting.

03

The Outcome

The Eric Armishaw Park toilet blocks came away from the project with a clean concrete surface, a waterproofed structure and a durable new epoxy floor finish. The combination gives the facility better resistance to both moisture and further tagging, supporting easier ongoing maintenance and a more presentable amenity for park users in Point Chevalier.

One Scope, Three Trades: Turning Around Vandal-Hit Toilet Blocks at Eric Armishaw Park

The public toilet blocks at Eric Armishaw Park in Point Chevalier, Auckland, run by Green by Nature, had taken a beating from constant tagging, ongoing moisture and the heavy cleaning regime that public amenities demand. Years of repainting had left layers of old paint sitting over the concrete block walls, hiding the true condition of the substrate underneath and leaving it without any real protection against water or further damage. Before any lasting fix could go in, that build-up had to come off.

BlastOff sandblasted the walls back to a clean concrete substrate, then applied a full waterproofing system across the block walls and floor to deal with the ongoing moisture that comes with a wet-use public facility. The floor was finished with a new epoxy coating, chosen for being hygienic, hard-wearing and easy to keep clean under heavy foot traffic. Combining sandblasting with waterproofing and a fresh epoxy floor meant each stage built properly on the one before it, rather than being patched over an unknown surface.

The toilet blocks came away from the project cleaner, more weatherproof and better placed to resist further tagging.

Councils, park managers and facility owners dealing with similar public amenities should treat paint stripping, waterproofing and flooring as one connected scope rather than three separate jobs, since the finish of each stage depends on the substrate condition left beforehand. A waterproofing membrane applied over old paint is only as reliable as what it is bonded to, and a new epoxy floor over an unconfirmed substrate can fail early. Where a building has a history of repeated repainting over unknown substrates, getting back to bare concrete first, then applying protective coatings suited to a wet public environment, tends to hold up far better than another coat over old paint. For similar facilities dealing with graffiti and moisture together, a scoping conversation should cover the paint history and the extent of any water exposure.

Testimonials

“BlastOff Solutions has become our go-to contractor. We’ve used them on several projects, and every experience has been excellent. They are dependable, knowledgeable, and consistently deliver high-quality workmanship on time and within budget.”

Project Images

Clients value our reliability, communication, and the quality of our work.

Ready to get started?

Planning crane or port maintenance? Talk to BlastOff.