Fire damage to the carpark had compromised more than the visible finish. The structural steel had lost its passive fire protection and its protective coatings, and the asphalt surfacing and line marking had also been affected. Restoring the carpark meant reinstating corrosion protection and fire performance together, rather than simply repainting over the damage, before the facility could reopen to daily traffic.
With the steel members and galvanised cable trays already blasted and the soot-affected areas soda cleaned, BlastOff applied intumescent paint to the structural steel to reinstate its passive fire protection. Durable protective topcoats were then applied throughout the carpark to restore corrosion protection and finish. The asphalt surfacing was restored and the line marking reinstated, bringing the coating and surfacing systems back together as one complete package suited to a carpark returning to daily vehicle use.
The carpark’s coating systems were brought back from a fire-damaged, bare-steel condition to a fully coated and line-marked facility, with passive fire protection reinstated on the structural steel. The finish was built to handle daily traffic, allowing the carpark to reopen for business with its protective and fire systems restored.
Once the fire-damaged steel and galvanised trays inside the TPW Wilson Carpark in Newmarket had been blasted back to bare, sound metal and the soot cleaned from surrounding surfaces, the carpark was still a long way from reopening. Fire had stripped the structure of more than its paint, it had taken the passive fire protection off the steel too, along with the coatings that kept corrosion at bay and the surfacing and line marking that made the deck usable. Restoring the building meant putting all of that back as one connected system rather than a simple repaint.
BlastOff applied intumescent paint to the structural steel first, reinstating the passive fire protection the fire had compromised, then followed with durable protective topcoats across the carpark to rebuild corrosion protection and finish. The asphalt surfacing was restored and the line marking reinstated, bringing the coating and surfacing work together so the carpark could go back into daily vehicle use with every system, fire, corrosion and wear, functioning again rather than just looking repaired.
The carpark went from a fire-damaged, bare-steel state to a fully coated, line-marked facility built to handle daily traffic, with passive fire protection reinstated on the structural steel throughout.
Fire recovery projects like this one show why coating decisions on structural carparks cannot be made in isolation from fire performance. Building owners facing similar fire or corrosion damage should ask how their contractor sequences fire protection ahead of topcoats, and how surfacing and line marking are coordinated with the coating programme rather than treated as a separate job. That sequencing is exactly what BlastOff’s commercial protective coatings service is built to manage, working from the abrasive blasting preparation stage through to the final coat.
Posted on Google Neville BrightTrustindex verifies that the original source of the review is Google. Damian came promptly, explained the process clearly and gave us a quote. The work was done professionally and Damian was available and easily contactable throughout. His team were great to deal with and completed the internal waterproofing of our garage and rumpus room. We were very happy with the result. N BrightPosted on Google Joe GainTrustindex verifies that the original source of the review is Google. Awesome work by Blastoff Solutions. Damien was a pleasure to deal with. Got back promptly to any queries and questions. Offering both a cost effective and practical solution to our needs. Work carried out to a high standard. Highly recommend.Posted on Google Kane ShortTrustindex verifies that the original source of the review is Google. Damian is a good communicator and the job was done to a good standard by his team. Thank you.Posted on Google DilipTrustindex verifies that the original source of the review is Google. Our rental property is concrete block unit and we had leakage from one of the wall of lounge. Danial of this company visited and and gave satisfying answers to my questions and after accepting the quote the work was done to my satisfaction.Posted on Google Caleb HynesTrustindex verifies that the original source of the review is Google. Good communication and did a great job. Estimated cost was very accurate.Posted on Google Marizaan van SchalkwykTrustindex verifies that the original source of the review is Google. Coming to the rescue, getting the job done in time! With amazing results! Very impressed, thank youPosted on Google Propertytrek LimitedTrustindex verifies that the original source of the review is Google. My deck looks like new again, thanks to Blastoff Washing team!Verified by TrustindexTrustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more