The tunnel’s existing intumescent coating had reached the end of its service life and needed to be replaced to maintain fire protection on the structural steel. Because the tunnel remained part of a live rail corridor, the work had to fit within strict access windows and avoid contaminating the surrounding tunnel environment, adding constraints beyond those of a typical structural coating project.
BlastOff vacuum blasted the aged intumescent coating from the structural steel, a method chosen for its full dust and debris recovery within the enclosed tunnel environment. Once the steel was stripped back, a new intumescent fire protection system was applied to the specified thickness, with dry film thickness measurements taken to verify the coating met the required build. The vacuum blasting approach and recovery process allowed the work to proceed within the rail corridor’s access windows without contaminating the surrounding tunnel.
The structural steel inside the Britomart tunnel had its fire rating restored through the new intumescent system, verified to the specified thickness by DFT measurement. The work was completed without contaminating the tunnel environment and without disrupting the rail services operating through the corridor during the project.
Deep inside the Britomart rail tunnel, the intumescent coating protecting the structural steel had simply reached the end of its working life, and replacing it meant operating in one of the more constrained environments BlastOff works in: a live rail corridor with strict access windows and no tolerance for contaminating the tunnel around live services. There was no scope to shut the corridor down for an extended period, so the method chosen had to fit inside the access BlastOff was given and leave nothing behind in the tunnel when the work stopped for the day.
BlastOff vacuum blasted the aged intumescent coating from the structural steel, chosen specifically for its full dust and debris recovery in an enclosed setting where nothing could be allowed to drift or settle beyond the work area. With the steel stripped back to a sound condition, a new intumescent fire protection system was applied to the specified thickness, verified with dry film thickness measurements to confirm the coating met the required build rather than relying on visual judgement alone. That combination, contained removal followed by a measured, verified application, is what let the fire rating be restored without contaminating the tunnel environment or disrupting the rail services running through the corridor during the works.
Any asset owner managing ageing intumescent systems in an enclosed or access-restricted environment, tunnels, plant rooms, basements, faces the same core question: how do you strip and recoat safely when the space cannot be isolated for long. The answer starts with a removal method matched to the containment needs of the site, verified film thickness rather than assumed coverage, and a realistic access plan agreed with the asset owner before work begins, all of which sit within BlastOff’s protective coatings service.
Posted on Google Neville BrightTrustindex verifies that the original source of the review is Google. Damian came promptly, explained the process clearly and gave us a quote. The work was done professionally and Damian was available and easily contactable throughout. His team were great to deal with and completed the internal waterproofing of our garage and rumpus room. We were very happy with the result. N BrightPosted on Google Joe GainTrustindex verifies that the original source of the review is Google. Awesome work by Blastoff Solutions. Damien was a pleasure to deal with. Got back promptly to any queries and questions. Offering both a cost effective and practical solution to our needs. Work carried out to a high standard. Highly recommend.Posted on Google Kane ShortTrustindex verifies that the original source of the review is Google. Damian is a good communicator and the job was done to a good standard by his team. Thank you.Posted on Google DilipTrustindex verifies that the original source of the review is Google. Our rental property is concrete block unit and we had leakage from one of the wall of lounge. Danial of this company visited and and gave satisfying answers to my questions and after accepting the quote the work was done to my satisfaction.Posted on Google Caleb HynesTrustindex verifies that the original source of the review is Google. Good communication and did a great job. Estimated cost was very accurate.Posted on Google Marizaan van SchalkwykTrustindex verifies that the original source of the review is Google. Coming to the rescue, getting the job done in time! With amazing results! Very impressed, thank youPosted on Google Propertytrek LimitedTrustindex verifies that the original source of the review is Google. My deck looks like new again, thanks to Blastoff Washing team!Verified by TrustindexTrustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more